Pack & Wrap Equipment Installation, John Lewis Blakelands, Milton Keynes

Client: John Lewis
Value: £64,000
Programme: 6 weeks

Electrical design and build project to undertake the installation of a new state of the art package machine, conveyor belt and wrapping benches. The installation included the supply of both 230/400v & cat 6 data outlets to feed all new services within the John Lewis Blakelands warehouse. Installation also included new electrical switch gear, 200amp TP-N distribution board, a combination of metal containment suspended from high level ceilings and low level containment mounted within the conveyor belt system, cat 6 data outlets and plug in play work benches. CCTV outlets were also installed at high level to assist with maintaining the safe system within the working environment.

Electrical Installation:
Small power
Data
Security installation
CCTV
Mechanical wiring
Metal containment
Main switchgear and metering
Sub main cabling and distribution equipment

Mechanical Installation:

Installation of air compressor which was connected to the new state of the art package machine