Client:
Conamar
Location:
99 Kensington High Street, London
Value:
£650,000
Programme:
52 Weeks

Electrical Design and Build Project. The scope of works was to reduce the area of existing GAP and H&M retail units at 99 Kensington High Street by removing the second floor area of their demise to allow the creation of the new second floor category A specification office area.

A new cycle store and shower block was also created within the existing boiler room in an annex building adjacent to 1 Derry St.

The project required very careful co-ordination, design and setting out with the whole project team, to ensure all services were installed with hidden fixings behind a non-accessible ceiling, prior to installing main M&E items.

Electrical installation:

New Sub Mains and MCCB panel installation.
Sub Distribution Boards.
Complete new exposed LV and ELV containment system.
Lighting.
Emergency lighting.
Lighting controls.
Small power.
Fire alarm.
Disabled alarm.
Mechanical wiring.
Lift supplies.